Management
OLUDEINDE B.OLADIPO PGD P-mgt, IRCA, ACI
Managing Director
OLUDEINDE B.OLADIPO PGD P-mgt, IRCA, ACI is an engineering / project management graduate of over twenty-two (22) years post NYSC cognate experience with adept knowledge in O&G Downstream Construction, Project Management, Onshore Facilities and Operations, Installation, Quality Control, Pre-commissioning Commissioning Processes, and Audit. He assumed the headship of Acorn Projects in late 2017, as an ardent stickler to details; DIPO started cutting his teeth in his career as a trainee engineer with Chevron Nigeria working at the Escravos Tank Farm Facilities and later at the Lagos Head office. He moved on to Clockwise Development as a site engineer. He had a short stint with Jolimair Limited. In his quest for exposure he got engaged with Moody International as Technical Specialist on the Addax- Pivot/GIS OML 123 Oron Well Head Fabrication/Installation Project. He joined Saipem (ENI) as QA/QC Engineer and had a broadened hand on the work experience spanning over a decade and half, contributing his
quota to the delivery of over ten major projects for the following clients: NAOC, NLNG, SPDC, Exxon Mobil, Total E&P, RSG, Dipo left Saipem as a Project Quality Coordinator on the Total E&P NOPL Project. A short synopsis is captured below: He started off as a trainee engineer at Chevron Escravos Terminal and later at the company’s HQ office in Lekki Lagos, from there he moved over to Clockwise Dev. Company as site Engineer overseeing commercial and residential projects for the company in Lagos. While at Jolimair as a project engineer coordinated the delivering of mass residential housing and road projects for the company in Rivers State. He moved over to Moody International as a Technical Specialist on the Addax- Pivot/GIS OML 123 Oron Well Head Fabrication/Installation Project. He joined Saipem ENI as a QA/QC Engineer on the NAOC/NLNG Phase 2 OB/OB 36’’ Pipeline / Gas Plant Rehabilitation Project. He was moved over to the Saipem-NAOC-Samabri Biseni Cluster 2, Flowstation Upgrade Project. He was among the team that delivered the geotechnics, piling (Installation, PLT, PIT) foundations, fabrication and installation of piperacks at Saipem-NAOC Okpai Independent Power Plant. He was moved over to the saipem-Exxon Mobil East Area Project EPC for the delivery of three Platforms with a total weight of 3500 tons and installation of 160km of pipeline installations. He joined the Saipem-SPDC Soku Debottlenecking DBN Project for the modification, upgrade and construction of additional facilities for increased capacity and improved operability. He participated on Saipem-NAOC/NLNG GTS 4 36” Rumuji Bonny Gas Pipeline and SPDC/ WILBROS 40” EGG- 1km pipeline: construction of 86km 36” 1km 40” SPDC /WILLBROS EGGS-1 sublet CS Gas Pipeline. He delivered with the team on the Saipem-SPDC Gbaran Ubie EPC for Pipelines, Flowlines and inter site cable: construction of 350km multiple pipelines/flow line node and inter site cable and EPC for FLB. He participated on the Saipem-RSG AFM Open Cycle Gas Turbine construction: Commissioning of 180mw Gas Turbine. He delivered with his team on the Total NOPL (Northern Option Gas Pipeline): Construction of 50km 24” x (11.1/15.9)mm CS Gas Pipeline from Rumuji NLNG Nodeto Imo River Node.
